| PROJECT MAP
The Federal Highway Administration (FHWA) has approved the three U.S. 95 Thorncreek Road to Moscow alternative/alignments recommended by the Idaho Transportation Department (ITD) for fur
ther study. The alignments are the same as those shown to the public at the January 2006 open houses - W4, C3 and E2
Approved Alternative/Alignment Maps
Alternative/Alignments sent to the
Federal Highway Administration (FHWA) for consideration |
|
|
|
• West (W4)
• Central (C3)
• East (E2) |
|
|
|
* Use Adobe Reader magnifying glass to increase the size of the displays in the pdf file.
|
|
To see the 10 alternatives/alignments in the Western, Central and Eastern corridors that were moved forward for environmental study, click on the links below.
|
| Alternative/Alignment Maps- |
|
Alternative/Alignment Written Descriptions- |
|
• West (3.5 MB)
• Central (3.5 MB)
• East (3.5 MB) |
|
• West
• Central
• East
|
|
* Use Adobe Reader magnifying glass to increase the size of the displays in the pdf file.
|
|
The following map illustrates the existing highway alignment (in red). This map will be updated in the future to include alignments that will be considered in project development.

|